How to Choose a Clinical Chemistry Analyser System: Some Pointers
The instrument price is the smallest part of the decision. What counts is the cost of every result you report over the whole life of the system.
Laboratory management
5 min read
Because modern analytical systems and stand-alone instruments are capital intensive, many departments are often involved in the selection process. In some health care systems the capital and running cost budgets are in separate hands, and this makes it very important that the laboratory can clearly define its (and the clinicians') needs. Yet many tenders are still decided on the instrument price, which is usually the smallest part of the cost.
Reagent rental, lease or purchase
Large analytical systems are often not purchased outright but paid for through "lease contracts". In this model, a regular payment is made which covers the costs of running the system, that is reagents, calibrators, controls and service plus a financial charge for the lease of the hardware itself. These contracts often run for five to seven years, and it is important to decide which tests will be performed on which piece of hardware; the system will shape the daily work of the whole team. A better way is to start from your own workload and test menu, and then compare suppliers on the cost of every result you actually report over the full contract.
Start with your own workload
Every selection should begin with data the laboratory already holds. Take at least twelve months of volumes from the laboratory information system (LIS) and look at:
Volume per test, split into routine, urgent and outreach work.
The peak hour, because an analyser sized for the daily average will queue samples in the morning.
Send-out tests you might bring in-house.
Expected growth over the contract period.
Remember the throughput advertised in the brochure is a theoretical maximum. Ask each supplier to model your real test mix and your real peak hour loading.
The test menu matters as much as speed. Check which of your assays each platform offers, and which would still need a second system or a reference laboratory. Every assay left off the main platform adds another supply chain, more sample handling, more disposables, another QC programme, and more training.
Chemistry, immunoassay or both
Traditionally the thinking was that a "clinical chemistry analyser" runs high-volume, lower-cost tests: electrolytes, enzymes, metabolites, lipids and specific proteins. System throughput, onboard reagent stability, water consumption, and disposable costs usually determined the comparison.
On the other hand, so-called "immunoassay analysers" which measure hormones, tumour markers, cardiac markers, serology and drugs, were considered higher-cost test workplaces. Often their menus were more proprietary, and the availability of one or two key assays often decided the choice.
Manufacturers have invested heavily in integrated systems; these combine lower-cost routine tests with more specialised testing (often using different measuring systems) in a single layout with one sample loading point and combined result output. These hybrid systems save disposables and staff time and help reduce clerical errors.
The only possible disadvantages may be that more of your menu is tied to one supplier, and if there is a malfunction or service issue, the whole menu is unavailable.
Cost per reportable result
A useful single figure is the cost per reportable result: all costs over the contract divided by the number of patient results actually reported. That denominator is the key. Every calibration, control, repeat, dilution and expired reagent pack uses reagent without producing a result. A quotation rarely shows this, so ask for it.
Cost component | What to ask for |
|---|---|
Instrument | Purchase price, or the share built into reagent prices |
Reagents | Price per kit, tests per kit, stability on board and after opening |
Calibrators and controls | Calibration frequency per assay, QC levels and runs |
Consumables | Cuvettes, tips, cleaning solutions, sample cups |
Service | Response time, preventive maintenance, uptime commitment |
Staff time | Daily, weekly and monthly maintenance |
IT | LIS interface, middleware licences |
Hidden waste | Dead volume, short-dated reagents, repeat rates |
Ask each supplier to calculate the cost per reportable result from your volumes and your QC rules, and compare the bids at your real volume and at a lower one. Read the minimum volume clause carefully. If your volumes fall, for example because a test moves to the point of care, your cost per result goes up. Also ask what happens at the end of the term: who owns the instrument, how long reagents and spare parts are guaranteed, and how your data and LIS settings move if you change supplier.
Automation
Laboratory automation ranges from a simple sorter in front of standalone analysers to a full track that links sample reception, centrifuges, analysers and storage. Published case studies show real savings, mainly in staff time and space. A teaching hospital in Brescia, Italy, that merged four laboratories into one automated site reported a 12.55% fall in total costs (Journal of Public Health Research, 2017).
But automation is not always the right answer. It needs space, a stable workload, good IT and a plan for when the track stops, and it binds the laboratory to one supplier for years. A smaller laboratory may gain more from a well-chosen integrated analyser and a better pre-analytical workflow.
Service and connectivity
A down analyser produces no results, whatever its specification. Treat service as a technical criterion:
guaranteed response and repair times, and where the nearest engineer and spare parts are;
a contractual uptime commitment, and what happens if it is missed;
a validated LIS interface, and who builds and pays for it;
middleware for autoverification and rerun rules, which cut unnecessary repeats;
operator training, included in the price.
Ask for reference sites with a similar workload, and talk to their managers without the supplier present.
Verification before going live
Before the new system reports patient results, the laboratory must show that it performs as the manufacturer claims, in its own hands. Most laboratories use CLSI EP15 for precision and bias, which can be completed in about five days (CLSI). Add method comparison with the old system, reference interval checks and LIS transfer tests.
Agree in the contract which of these tasks the supplier performs and which the laboratory does, and do not sign the acceptance certificate until they are complete.
Double-check your lab's requirements, then the tender
Before writing a specification, decide whether each test should be run in-house at all. A low-volume specialist assay may be cheaper and better when sent to a reference laboratory, while a high-volume urgent panel almost always belongs in-house.
A sound procurement process then runs in this order:
Define the need from workload, menu and clinical plans.
Decide make or buy for each test group.
Scan the market for suppliers who can serve your country and volume.
Write the specification with weighted award criteria.
Request the cost per reportable result at your volumes.
Evaluate technical merit, cost and service, including reference visits.
Negotiate volume clauses, price increases, uptime and exit terms.
Install, verify and train against criteria agreed in advance.
An independent view is most useful early, before the specification is written and while every option is still open.

Peter Charles Mimms
40 years in diagnostics
Peter Charles Mimms is a medical laboratory science consultant with over 50 years in medical laboratory science, about 40 years in the diagnostics industry and 10 years in the hospital laboratory.
New articles by email
One short article a week on IVD, laboratory practice and sourcing. Unsubscribe any time.
Your email is used only to send new articles. See the privacy policy.

